3. Draw the map: indoors, from the requirement 2 notes
Required
Using a protractor and scale, plot the points and draw the survey to scale: north arrow, scale bar, title, date and a diagram of the lot. Submit a neatly drawn copy. Nothing about this happens in the field.
Notes and warnings
Note. Five things have to be on the finished drawing besides the survey itself: a north arrow, a scale bar, a title, the date, and a diagram of the lot you measured. It is submitted as a neatly drawn copy, so it is worth drafting once before drawing it properly.