Scout Ahead https://www.scoutahead.org/plans/railroading-merit-badge

Railroading Merit Badge

Seven requirements drawn so that the one requirement carrying the whole cost of the badge is seen before it is reached, so the cheap pair inside each of requirement 7's two options is visible while the option is still being chosen, and so the two nine item lists in requirement 4 are not written twice.

8 steps (39 parts inside them). 22 parts depend on questions you have not answered yet. · Version 1, published 13 August 2026 · About Railroading Merit Badge

This is the whole plan: everything that could apply to anybody. Answering the 5 questions at the address above takes out the parts that are not for you.

Which of this applies to you

You have not answered anything yet, so this is the whole plan: everything that could apply to anybody. Answering 5 short questions will take out the parts that are not for you.

The steps

Stage 1 of 8

1 step

Stage 2 of 8

1 step
  • 2. Amtrak, a planned trip, and rail transit Requirement

    Both parts required. 2(a) is three jobs in one: what Amtrak is and why it was formed, a real trip planned from a timetable, and the details of that trip listed. 2(b) is a survey of rail based public transit.

    2 parts
    • 2(a). Amtrak, then plan a trip of at least 500 miles Often forgotten THREE JOBS IN ONE REQUIREMENT, AND THE LAST ONE HAS THREE DETAILS PEOPLE MISS. The jobs are the purpose AND formation of Amtrak, a trip planned from a timetable, and the details of that trip listed. On the trip: the two cities must be AT LEAST 500 MILES APART, so check the distance before you settle on a route. The requirement asks for the train NUMBER AND NAME, which is two things, and long distance services usually have both, so a named train makes that half answer itself. And TYPE OF SERVICE means what you would actually be buying, a seat or a room to sleep in, which the schedule for your route sets out. IF YOU ARE TAKING REQUIREMENT 7 OPTION B AND ITS FOURTH CHOICE, plan both trips at the same sitting, because that choice is this requirement carried out for real and the badge never tells you so.

Stage 3 of 8

1 step

Stage 4 of 8

1 step

Stage 5 of 8

1 step

Stage 6 of 8

1 step

Stage 7 of 8

1 step
  • 7. One option, two choices, and the whole cost of the badge Often forgotten Requirement

    THE ONLY REQUIREMENT HERE THAT COSTS TIME OR MONEY, AND IT IS NUMBERED LAST. Both options need your parent or guardian's and your counselor's approval first, and both then ask for TWO choices. The names mislead: the option called Model Railroading contains the cheapest work on the badge.

    THIS IS THE ONLY REQUIREMENT ON THE BADGE THAT COSTS ANYTHING, AND IT IS NUMBERED LAST. Requirements 1 to 6 are reading and explaining, and can all be done at a table. This one asks you to choose an option, get your parent or guardian's AND your counselor's approval, and then do two things. DECIDE IT FIRST EVEN THOUGH IT IS PRINTED LAST, because it is the only decision here with a cost attached and the approval has to be given before you start rather than shown afterwards. AND DO NOT CHOOSE BY THE NAMES. Option A is called Model Railroading and contains a layout drawn with a pencil, four websites, and an explanation of direct current against digital command control, three of which need nothing bought. Option B is called Railfanning and two of its four choices require purchasing tickets. The option that sounds expensive is the one that can be finished for nothing.

    14 parts

Stage 8 of 8

1 step
  • Counselor signs it off Milestone

    The completion date is the date you met the requirements, not the date of the signature.

    Usually comes after 7. One option, two choices, and the whole cost of the badge.

    Merit badge requirements are republished annually. A Scout beginning work uses the requirements as they stand then; a Scout already working may finish under the ones they started with. Guide to Advancement 7.0.4.3 governs which applies. This page records the date its copy was read. Check it against the official page before relying on it.

This plan is a planning aid: the current Boy Scouts of America publication is always the authority, and the sources used here are listed in full. Each step names its own.