Scout Ahead https://www.scoutahead.org/plans/life-rank/steps/01M0BG90C65SWRE6E5HXRHJC26

Approval

8. Board of review

Required

The last step. If it does not approve, there is a route of appeal and the sheet names it.

Notes and warnings

Note. If the board of review does not approve the advancement, the decision may be appealed. The sheet says so in a footnote and names Guide to Advancement 8.0.4.0 as the procedure.

Where this step comes from

  1. Scouts BSA Rank Requirements (Requirements sheets dated 2025-12), Requirement 8 · The board of review for this rank, with a footnote pointing at the appeal route in Guide to Advancement 8.0.4.0.