Scout Ahead https://www.scoutahead.org/plans/drafting-merit-badge/steps/01M0BG8VP9RQ1RM35P0JJVT433

Task · part of 3. The CAD drawing, and this one is not waiting on anything

3(a). Architectural, in CAD

Optional May not apply

This may not apply to you. You have not answered "Requirement 3: which CAD drawing?" yet. Answer it and this step will either settle or drop off.

The same scope as 2(a): architect's scale, dimensions, sectional drawings and construction notes. Unlike 2(a), no bill of materials is asked for.

Notes and warnings

Note. Unlike its requirement 2 twin, this asks for no bill of materials. Worth knowing before requirement 4, where your counselor's redline may ask you to change a bill-of-materials quantity.

Where this step comes from

  1. Drafting Merit Badge Requirements (Merit Badge Hub, last modified 2025-09-19), Requirement 3(a)

Back to the whole plan